The RFP Database
New business relationships start here

Professional Testing & Balancing Services of HVAC Equipment


Texas, United States
Government : Municipal
RFP
Go to the link
This document has expired, therefore the above link may no longer work.

The Test and Balance personnel shall check, adjust, and balance the components of the air conditioning system which will result in optimal noise, temperature, and airflow conditions in the conditioned spaces of the building while the equipment of the system is operating economically. This is intended to be accomplished after the system components are installed and operating as provided for in the contract documents. It is the responsibility of the Mechanical Contractor to place the equipment into service. Variable air volume systems shall be balanced in accordance with AABC 1989 Standard, Fifth Edition.

    1. Home
    2. Articles
    3. Login or Register

    4. Search

    5. Add/Announce your RFP