The primary purpose of this project is to evaluate drainage needs in the Basin,
determine the needed outfall alignment(s) to provide a storm sewer system that is in compliance with the City Storm Drainage Design and Technical Criteria, and produce construction plans and specifications needed to construct the outfall(s).