Proposer is to provide Original Equipment Manufacturer (OEM) direct Purchasing
Supply Chain Management consulting services for Facility Equipment, Commodity and
materials planned to be incorporated within California State University,
Northridge's facilities and construction projects. Projects that may utilize these
services include the new biology laboratory building, Chaparral Hall, and the new
performing arts center. Chaparral Hall is an approximately 90,00 gross square foot
building that includes biology instructional and research labs, department offices,
faculty offices, lecture rooms, and several mathematics and geology labs. The
performing arts center is an approximately 166,000 gross square foot building that
includes a 1,600 seat performance hall and 200 seat black box theater with support
spaces. The building also includes a radio station, theater labs, large lecture
hall and offices.