The Project:
The implementation of the second phase of the student union quadrangle project which includes the construction of a new terrace, lighting, stairs to the quad and regrading of existing grades.
Scope of Work:
Work will include but is not limited to the following:
Construct a terrace adjacent to the Student Union building
Regrade site topography
Install new exterior lighting