Note: mandatory walk-through 01/12/2010.
Contractor shall remove the existing roof system down to the tectum deck (Composite Cementous Wood Fiber Board) including all composition base flashings. Contractor will dispose of all materials properly. All removal shall comply with federal, state, and local codes and regulations and shall be disposed of in a legal manner.
New work shall include, but is not limited to, the installation of a new 60 Mill EPDM Roofing System. Contractor shall include all related items of work as noted herein or indicated on the drawings or otherwise required to complete the specified elements of work and provide the necessary warranties for this work.
Additional work will include limited brick replacement and re-pointing of the parapet as noted on the drawings.
Completed roofing system shall carry a 20 year warranty.