The City is requesting proposals from qualified firms to enter into a contract to conduct a study on the Port and Harbor rate fee structure, and the economic impact of mooring a MODU (mobile offshore drilling unit) at the Port. The City’s goals for this study are (1) to determine a sustainable, equitable rate structure based on the existing facility infrastructure and services for its Port and Harbor; and (2) to complete an Economic Benefit Analysis on the recent Port and Harbor visit.