Base-removal/protection/reinstallation of diving board stands, slide, pool lights, pool fittings, deck fittings. Demolition of areas of pool deck & sections of pool shell. Coordination, selective demo and/or removal/replacement of electrical, piping, mechanical & specialty items. Add #1-basic cathodic protection & pool side cathodic protection. Add #2-ground side cathodic protection. Add #3-domestic water pipe replacement. Ded #4- re-use existing 10" gutter piping.