The work is that of removal of plaster/tile and re-plaster/re-tile and additional related construction, including lap pool new cantilever, waterproofing gutter, plaster, tile, new main drains, valves and learner pool plaster, tile, main drain grates, wall inlets, recirculation pump, filter and concrete decking and fence material surrounding both pools.
There is a non-mandatory pre-bid meeting 8/29/2011.