The work includes providing all engineering and construction services to complete a 30-foot wide by 40-foot long pole barn. The pole barn shall be wood frame construction with a minimum 14-foot vertical clearance, closed gable ends and open bays suitable for easy access by fork lift trucks utilized at the Waste Management Facility. The pole barn will be used for storage of baled recyclable materials. The estimated contract value is $32,500 +/-.