The scope of work will include installing the new playground equipment supplied by the County; installing the poured-in-place rubberized surface; installing footers and redo the mulch base and sidewalks; installing the Picnic Pavilion which includes a utility locate and obtaining any permits for water and electrical for the pavilion to support an outlet and hose bib.