The City of Poway
is requesting proposals for the turnkey design and engineering of a new Photovoltaic Solar System at the Poway Public
Works Operations Facility. The Photovoltaic system shall be designed to supply a minimum 90% of the current facility
demand (Attachment D). The proposal will also include preparation of an RFB document (Attachment F), and consulting
during the bid and construction phases of the project. The following information outlines the scope of work, schedule, and
criteria that will be used to judge the proposals. This project is funded under The American Recovery and Reinvestment
Act of 2009 [Special Terms and Conditions] (Attachment A), and National Policy Assurances August 2008 (Attachment B)
UTILIZING AMERICAN MADE STEEL AND LOCAL RESOURCES. The Designer awarded the project may also be
requested to review the existing Photovoltaic System on Fire Station #1 located at 13050 Community Road and provide
recommendations and design for expansion. Work will be performed based on Operations Center Photovoltaic Solar
Design unit proposal prices for project proposal. Docs / Specs Below are the docs/specs of the RFP/RFQ you selected.
Click on a file name to download. Document Name Document Type Size Date Submitted Plans & Specifications
Document 3877Kb 12/28/2009 Description: Photovoltaic Solar Design Consulting Services for the Poway Public Works
Operations Facility RFP No. 10-004 Addendum No. 1 Addenda 971.2Kb 12/29/2009 Description: Addition of Cover page,
Table of Contents and Revised Attachment G Q&A No questions or answers have been posted to this site.