The purpose of the project is to construct a 5' wide sidewalk on the south side and an 8' wide shared use path on the north side, installation of a video detection system, minor storm sewer work, and such other work as may be necessary to complete the contract in accordance with the plans and specifications set forth in the Bid Submittal Documents.