This project consists of the replacement of an existing 132 feet long, 3 – span steel stringer bridge on timber bents with a new 123 feet long, 3 – span (41 feet each) prestressed concrete slab beam bridge on concrete bents. Additional work includes: the construction of concrete approach slabs and the replacement of approximately 145 square yards of asphalt trail with a new concrete pavement.