This document has expired, therefore the above link may no longer work.
The project consists of replacement of the Buxley Pedestrian Bridge and includes approximately 192 LF of 30" drilled shafts, approx. 150 cy of structural concrete, 3 prefabricated truss bridge spans, and associated excavation, and approach paving.