Non-mandatory pre-bid meeting 02/24/2010.
Drive A project consists of the construction of approximately 1.09 miles of four lanes divided concrete curb and gutter boulevard section with a raised median. The proposed pavement structure consists of 10-inch concrete underlain by 8-inch Lime-Flyash stabilized subgrade. The construction includes outfall into County Flood Control Channel and new/modified traffic signals along the Drive.