Mandatory pre-bid meeting 12/02/2009.
Project consists of the construction of approximately 5,060 LF of four lanes divided concrete curb and gutter boulevard section with a raised median to replace existing two-lane asphalt roadway. The proposed pavement structures consist of 10-inch concrete underlain by 6-inch portland cement stabilized subgrade. The proposed construction also includes construction of a storm sewer system with outfalls and detention pond along with new twin bridge structures and a box culvert crossing at the bypass.