The Town is accepting bids to shim and overlay Weathersfield Center Road during the 2010 paving season. The Town has budgeted a total of $431,600 for this project. As much of the road as possible will be shimmed and paved until the budget limit is reached. The Town reserves the right to increase or decrease this budget limit. The shim shall be 1 and the overlay a minimum of 1.5.