Intermittent Hot-Mix Asphalt Pavement Repairs, Partial Depth along I-90 and I-294; Longitudinal Joint Repairs with Hot-Mix Asphalt materials along I-294; Bridge Joint Removal and Replacement at I-90 over IL31; Slab Jacking for I-294 and I-355; Concrete Pavement Patching for I-88 and I-294; and Restriping of pavements as needed all including the attentive work area maintenance of traffic as necessary to provide a safe and complete work zone.