This document has expired, therefore the above link may no longer work.
The work consists of removing existing Asphaltic Concrete pavement by milling, overlaying with a new Asphaltic Concrete(1/2" Mix)(End Product)(Special Mix), installing Loop Detector, Pavement Marking, Signing, and other related work.