This project involves reconstruction of existing asphalt concrete pavement with new asphalt concrete. Incidental work will include miscellaneous concrete work such as curb, gutter, sidewalk, and curb ramps, miscellaneous drainage work such as catch basin and cross drain installations, installation of video traffic detection system and loop detectors. All tree root trimming necessary to accomplish the work shall be done by the Citys arborist upon 48 hours notice.