Optional pre-bid meeting 03/09/2010.
The proposed work shall be performed in accordance with the plans, specifications and other contract
documents and shall consist of the following: the placement of 2 inch depth Asphalt Rubber Hot Mix-Gap
Graded overlay; pavement removal and
replacement (base failure repairs) at various locations, pavement grinding, replacement of traffic lines,
markings and markers, traffic signal loop replacement, ADA enhancements to Traffic signal systems and curb
ramps, adjustment of utility covers to finished grade and other minor improvements as described in this
contract.