The principal items of work include, but are not limited to: mobilization, traffic control, cold milling existing AC pavement variable depth (4” to 8”), pulverize, treat and place 8” of existing pavement (full-depth reclamation with cement-treated process) per the project Specifications, construction of new 4”-thick AC pavement overlay, speed humps, adjustment of utility valve can and cover to grade, adjustment of manhole frame and cover to grade, restoration of traffic striping and markings, and other related work.