Mandatory pre-bid meeting 01/19/2010.
Note: must register at site to access full RFP (registration is free).
The Pavement Preservation projects involve the construction of street improvements. Work shall include, but not be limited to: constructing, maintaining and removing temporary work zone traffic control and erosion control measures; adjusting existing manholes, cast-iron valve lids and frames; constructing roadway improvements including cold planing, aggregate base, and HMAC wearing surfaces; and placing pavement markings and striping.