The proposed work consist of milling and replacing 3 to 5 inches of AC, overlaying inch of AR-ACFC, removing and replacing guardrail, installing loop detector traffic counter system, removing bridge rail and replacing with bridge concrete barrier, pavement markings, signage and other related items.