This RFP is for clearing and grubbing, topsoil removal and stockpiling, disconnecting, capping or sealing, and abandoning site utilities in place, and disposal of all vegetation, rubbish and excess material, as required for site grading and related staging areas as noted on the drawings and in accordance with these specifications. Protecting existing trees, shrubs, groundcovers, plants and grass to remain shall be dictated by Landscape Architect.