Supplying of all the labor, materials, scaffolding, ladders, tools, equipment and appurtenances to remove an existing deteriorated spray polyurethane roofing (SPF) system from Building No. 37 and install a new Thermoplastic Polyolefin (TPO) single ply membrane roofing system over the existing roof deck within the contract area.