Note: must register at site to access full RFP (registration is free).
There is a mandatory pre-bid meeting on March 23, 2010 at 10:00 AM.
The project involves the installation of ultra thin white topping concrete and provide permeable concrete to address storm water run off. An award will be made to a single prime bidder for this project.