The removal and reconstruction of approximately 4400 square feet of an asphalt concrete emergency access road; import and placement of approximately 275 cubic yards of structural fill material; construction of 2,000 square foot asphalt parking lot; installation of geotextile material and rip rap for slope protection; removal and reconstruction of existing PCC access driveway; placement of parking space pavement markings and installation of recycled plastic curb stops, AC dike, handicap sign, two PCC headwalls, guardrail assembly; relocation of existing fire access gate; removal of bollard and clearing and grubbing areas.