The Contractor will be responsible for the installation of the following
All site work (clearing, demolition, grading, sediment erosion control, NPDES monitoring, construction materials testing, etc) required for 8’wide multi-use asphalt trail, new asphalt
vehicular entrance and parking area , Open Picnic pavilions, an outdoor classroom area, utilities (sanitary, water, storm) and storm water treatment, concrete sidewalks,
modular retaining wall(s), site furnishings, and landscaping.