Announcement Info : Park & Ride Facility This project includes but is not limited to the: The contractor shall provide all labor, materials, equipment, supervision, permits and all other related items required to construct a Park and Ride Facility for approximately 140 vehicles on a two (2) acres site located at the SW quadrant of the intersection of NW 186 Street and 73 Avenue under the FPL high voltage lines. The scope of work includes: demolition and removal of existing asphalt pavement and concrete sidewalks, clearing and grubbing, removal and relocation of existing trees, installation of underground utilities (power domestic water and irrigation water, sewer and telephone), adjusting existing manholes and valve boxes, installation of drainage system, paving, pavement markings, lighting, landscaping and irrigation system, installation of a pre-fabricated security guard booth with lavatory facility, chain link fencing and modifications to NW 186 Street and NW 73 Avenue to allow for ingress and egress to and from the facility. For a detailed description of the scope of services, contractors must refer to the construction documents and plans for project Number CIP012 available at the Transit Department's contract Services Division. This is a federally funded project with a 14 percent DBE Goal assigned. Davis Bacon General Wage Decision No.: FL20080032 02/06/2009 applies and will be enforced on this project. Last day to purchase Bid documents is Friday, May 1, 2009.
Technical Certification : General Building Contractor, Building Contractor, General Engineering