Painting the underside of the eastern approach span of the bridge as depicted in the photos included in the bid documents. This area has seven (7) beams with span lengths of approximately fifty feet (50 Ft) total along with six (6) to eight(8) stringers that are approximately nine feet (9ft) long. Approximately 3,200 SF of surface area is to be prepped and painted.