POS and Digital Signage at Stadium


Alabama, United States
Education : University
RFP
Go to the link
This document has expired, therefore the above link may no longer work.

The Contractor shall be responsible for providing all video and control equipment as described.
B. Contractor shall be responsible for assembly, secondary modifications (if necessary) and powering
of all video components onto new or existing structures.
C. Owner will provide Primary Power at defined demarcation points as shown on the project electrical
drawings. Contractor shall be responsible for all power and electrical distribution from demarcation
point (Secondary Power) to new system(s). Contractor shall provide all Secondary Power
connections/terminations required to power new system(s).