Provide all labor, equipment and materials: Approximate quantities include: 52,000 SY 2� avg. milling; 26,000 LF edge milling; 10,000 T asphalt overlay; 2,000 SY asphalt patching; 3,000 LF Curb, gutter, walk; 1,500 SY Concrete pavement; 750 LF vertical curb & gutter; 11,000 SF paint striping; 11,000 SF epoxy striping