The Work for the project, FY2012 Overlay Program, includes but is not necessarily limited to: Full depth asphalt patching, asphalt milling, placement of 2-inch thick asphalt overlay, pavement striping, curb replacement, sidewalk ramp replacement, and providing traffic control, as specified by the Owner, including all materials, labor, equipment, supervision, and any and all other items necessary to complete the work.