This requirement is for a follow-on repair contract with one(1)-year basic and four 4) one(1)-year options. This is a 100% contract overhaul item. The Mainshaft Bearings are critical to building the core modules for the F100-PW-229 engines. The Government does not have organic repair capability and there is no workload transition.
Devin D. Ray, Contract Specialist, Phone 4057394488, Email devin.ray.3@us.af.mil