The project includes all labor, materials, equipment, supplies, supervision and incidentals necessary for the rehabilitation of the Otter Creek Bridge. Work includes but is not limited to the following:
* Soil erosion and pollution control
* Temporary traffic control
* Removal and disposal of one (1) existing glued-laminated deck panel
* Removal of all existing sawn timber bridge rails and replacement with glued-laminated rails
* Removal and replacement of five (5) timber bridge rail posts
* Removal and replacement of two (2) timber abutment posts
* Removal and replacement of fourteen (14) timber wingwall posts
* Installation of four (4) Type 3 Object Markers
* Removal of existing asphalt paving at bridge approaches and end deck panels on bridge, and installation of aggregate base and asphalt paving
* All other items incidental and necessary to complete the work in accordance with the plans and specifications.
Price range is between $25,000 and $100,000. Solicitation will be available for download from FedBizOpps website at http://www.fbo.gov on or about 07/23/2014. A payment bond (100 percent) will be required after award.
NOTE: Prospective awardees must be registered in the System for Award Management (SAM) to be awarded a Federal Government Contract. If you are not registered, please register at the following site: http://www.sam.gov/portal/public/SAM
Eileen Northrop, Contract Specialist, Phone (541) 618-2017, Fax (541) 618-2148, Email [email protected] - Maria E. Sage, Procurement Technician, Phone 541.618.2020, Fax 541.618.2148, Email [email protected]