The RFP Database
New business relationships start here

Otter Creek Bridge Rehabilitation


Oregon, United States
Government : Federal
RFP
Go to the link
This document has expired, therefore the above link may no longer work.

The project includes all labor, materials, equipment, supplies, supervision and incidentals necessary for the rehabilitation of the Otter Creek Bridge.  Work includes but is not limited to the following:

* Soil erosion and pollution control
* Temporary traffic control
* Removal and disposal of one (1) existing glued-laminated deck panel
* Removal of all existing sawn timber bridge rails and replacement with glued-laminated rails
* Removal and replacement of five (5) timber bridge rail posts
* Removal and replacement of two (2) timber abutment posts
* Removal and replacement of fourteen (14) timber wingwall posts
* Installation of four (4) Type 3 Object Markers
* Removal of existing asphalt paving at bridge approaches and end deck panels on bridge, and installation of aggregate base and asphalt paving
* All other items incidental and necessary to complete the work in accordance with the plans and specifications.

Price range is between $25,000 and $100,000. Solicitation will be available for download from FedBizOpps website at http://www.fbo.gov on or about 07/23/2014.  A payment bond (100 percent) will be required after award.

NOTE:  Prospective awardees must be registered in the System for Award Management (SAM) to be awarded a Federal Government Contract.  If you are not registered, please register at the following site:  http://www.sam.gov/portal/public/SAM


Eileen Northrop, Contract Specialist, Phone (541) 618-2017, Fax (541) 618-2148, Email [email protected] - Maria E. Sage, Procurement Technician, Phone 541.618.2020, Fax 541.618.2148, Email [email protected]

    1. Home
    2. Articles
    3. Login or Register

    4. Search

    5. Add/Announce your RFP