This project consists of excavation and back fill work, removal of existing bridge expansion joints and pedestrian railing, curb, gutter, sidewalk, concrete pavement, asphalt mat and portions of present structure(s) and the installation of new bridge expansion joints, railing, pedestrian railing and security barriers of various types, placement of chain link fencing and Type 3 rail; paint steel girders, remove debris from culverts, placement of concrete walks, curb, gutter, concrete pavement, aggregate base course, and ramps; placement of rip rap, concrete deck sealing, repair/replacement of water proof membrane, repair of concrete deck; asphalt patching, clean deck drains, clean bearings, routing and sealing of cracks and providing traffic impact attenuators, traffic control and mainlift(s) and the undertaking of slab jacking and/or mudjacking.