PRE-DELIVERY SERVICE: The unit shall be delivered complete and fully operational. Complete
instructions for proper installation shall be furnished with each unit.
SET-UP AND TRAINING: The services of a competent technician, thoroughly trained in the use,
operation and servicing of the unit, shall be furnished for a minimum period of one working day for each
delivery point. The technician shall instruct personnel in the proper use, safety, operation and
preventative maintenance of the unit and to test the unit for satisfactory performance. This instruction
shall be performed on a date to be agreed upon by the District Equipment Shop Superintendent.
PRINTED MANUALS: One shop manual, parts manual, and operator's manual shall be supplied with
each unit. The manuals shall fully and clearly cover all components of the unit, including attachments.
HEATING UNIT: Unit is to be a multi-oil fueled heater with a minimum of 350,000 BTUH capacity.
It must be designed to heat with used crankcase oil, transmission fluid, synthetic fluids, and number one
and two fuel oil. Unit is to be fully automatic, thermostatically controlled. Unit is to be tested and
approved by Underwriters Laboratories (UL). Unit is to be ceiling mountable and capable of
functioning when mounted up to eight (8) feet off the floor. All pumps required for unit operation shall
be furnished. The Transfer pump shall be able to supply-40 oil from a 300 foot distance.