The scope will be the demolition and interior finish-out of approximately 4500 GSF of existing space in the Hoblitzelle Building (G). The space will require demolition and new construction including, but not limited to, ceilings, flooring, partitions, painting, new accessories, mechanical, electrical and plumbing systems, mechanical equipment, fire alarm, controls, testing and commissioning as shown on the drawings.