Nutrients Compliance for the Wastewater Treatment Plant The project for which the Work
under the Contract Documents may be the whole or only a part is generally described as follows:
1. Replacement of plant influent flow meters,
2. Construction of a new primary clarifier,
3. Construction of a new primary clarifier waste pump station,
4. Replacement of existing Plant B Primary Clarifiers effluent launders,
5. Modifications of Primary distribution box,
6. Conversion of the existing biological treatment process to an Integrated Fixed-film Activated Sludge (IFAS)
system,
7. Replacement of Process Air Blower System,
8. Modifications of aeration distribution system,
9. Replacement of RAS and WAS pumps located in RAS/WAS Pump Station No.1, No. 2, and No.3.
10. Construction of a new methanol polymer facility,
11. Upgrades to plant potable and non-potable water distribution systems
12. Improvements to associated electrical, instrumentation, and site work.