This project includes the in-place reclamation of existing pavement, the removal and disposal of
pavements and underlying poorly drained base material, the redistribution of reclaimed pavement
to achieve desired final pavement grades, demolition and disposal of identified curbing and
sidewalks, the installation of new curbing, installation of new drainage structures, replacement of
all catch basin tops and adjusting them to the final pavement grades, installation of new
bituminous paving, installation of brick paver traffic calming ‘speed tables’ installation of
accessibility ramps, installation of new sidewalks and fencing, and miscellaneous restoration and
incidental work.