The City of Jacksonville Beach is requesting proposals from qualified Contractors or firms to enter into a design/build contract with the City to design, provide, and install a 300 foot Class III 130 MPH wind load, self supported tower as described in the following specifications. The tower will be designed to TIA-222-G standards and meet all applicable laws and requirements.
The Contractor or firm shall provide all materials, labor, site preparation, foundation, design and construction permits, tower lighting, and installation of the new tower. The tower will be built in the NE lot of the O&M facility at 1460 Shetter Avenue (see Attachment C). Included in the proposal is the labor to install the Citys radio equipment and coax on the tower. The tower will also include a metal wavebridge for power cables and coax, at a height of approximately 14 ft, from the tower to the 2nd floor radio room approximately 30 feet from the tower. The approved tower, foundation, and waveguide bridge will include all of the specifications to design, build, and install the tower as outlined in this proposal and be accompanied by a stamped set of engineered drawings for the tower, wavebridge, and foundation. The design/build tower proposal will be for an all-inclusive fixed price. All material, tower, and equipment will be FOB Jacksonville Beach.