Regrade the existing area of construction and excavate for a retaining/frost wall and building structural post foundations. Provide and install a wooden Pole Building shell with posts, top girts, trusses, metal wall and roof panels. Also install 4 man doors and 2 overhead sectional doors and concrete pads for the man doors.