This project consists of sidewalk improvements along 16th and 17th Streets, between Dawson Street and Savannah Court, as shown on the project plans. The project includes sidewalk construction, associated clearing and grading, retaining wall construction, wheelchair ramp construction, retrofitting existing wheelchair ramps with detectable warning mats, installation of thermoplastic stop bars and crosswalks, and adjustment of any utilities located within the sidewalk area. (Allotted time is 90 calendar days for completion.)