FURNISH AND INSTALL NEW FIBER OPTIC CABLE TO CONNECT UT 1 job SYSTEM COMPLEX TO GAATN BACKBONE CABLE. CONTRACTOR MUST BE GAATN AUTHORIZED SERVICE PROVIDER WITH APPROVAL TO ACCESS GAATN MANHOLE. INCLUDE ALL ASSOCIATED PROJECT COSTS WITH YOUR BID RESPONSE; I.E. ENGINEERING, PERMITTING, LABOR, CONSTRUCTION AND MATERIALS. SERVICE INCLUDES THE FOLLOWING TASKS AND SPECIFICATIONS:
1) INSTALL NEW UNDERGROUND CONDUIT INTO THE LAVACA BUILDING FROM GAATN Z-NET MANHOLE LOCATION SPECIFIED BY GAATN MANAGER.
2) INSTALL NEW 48 POSITION PATCH PANEL IN LAVACA BUILDING
3) INSTALL NEW 48 POSITION PATCH PANEL IN COLORADO BUILDING
4) INSTALL SUFFICIENT CABLE FROM THE MANHOLE TO:
A) SPLICE ALL 8 UT A1N GAATN STRANDS (4 STRANDS NORTH AND
4 STRANDS SOUTH) INTO LAVACA BUILDING PATCH PANEL WITH
PATCH PANEL INSERTS AND ST CONNECTORS.
B) SPLICE 24 CITY OF AUSTIN STRANDS (12 STRANDS NORTH AND
12 STRANDS SOUTH) INTO COLORADO BUILDING PATCH PANEL
WITH PATCH PANEL INSERTS AND ST CONNECTORS.
C) LEAVE 4 STRANDS IN THE MANHOLE AVAILABLE FOR FUTURE
FIBER EXPANSION TO PATCH PANEL SPACE IN THE LAVACA
BUILDING.
5) INSTALL 24 STRANDS FOR UNIVERSITY FROM A PATCH PANEL IN
THE LAVACA BUILDING TO A PATCH PANEL IN THE COLORADO
BUILDING.
6) PROVIDE A COMPLETE SET OF PRELIMINARY PROPOSED
CONSTRUCTION DRAWINGS FOR APPROVAL BY THE CITY OF AUSTIN
PRIOR TO CIMMENCEMENT OF ANY WORK ON THE PROJECT. SUBMIT
DRAWINGS TO THE AGENCY TECHNICAL CONTACT LISTED ABOVE.
7) PROVIDE A FINAL SET OF AS-BUILT DRAWINGS, REVISED TO SHOW
THE FINISHED PROJECT, UPON COMPLETION OF JOB.
2 DISCOUNT OPTION: PROVIDE QUOTE FOR COST REDUCTION AND 1 each
DELIVERY SCHEDULE, FOR PROJECT DESCRIBED IN ITEM 1, IF WORK IS PERFORMED IN CONJUNCTION WITH CURRENT PROJECT WITH TRAVIS COUNTY INVOLVING WORK IN THE SAME MANHOLE. CONSIDER REDUCTION IN TOTAL COSTS FOR ENGINEERING, PERMITTING AND DURATION OF STREET CLOSURE ON LAVACA STREET.