The scope of work will be multi-disciplined including fire, mechanical, electrical and architectural. The fire scope consists of proper zoning, installation of a gas suppression system for the IT center and sprinkler system modifications. The mechanical scope involves installation of new HVAC for the office area, replacing the CRAC units for the IT equipment, and replacing AHUs for the electrical room. The electrical scope includes installation of new PDUs, distribution for the IT equipment, UPS, transfer switch, removal of under floor whips and electrical service modification. The architectural scope consists of building new offices, walls, a restroom and paving.