Scope of materials to be provided and installation services to be performed: materials and labor to install, terminate, test and label OM3 50 micron interlocking plenum fiber from the Data Center to 15 floors of the City Building. 12- fiber strands shall be ran to the sub-basement, basement, floors 1-8 and floors and 10-13. 24- fiber strands shall be ran to the 9th floor.