Amendment #1 changes the gradation of the shoulder aggregate, provides a map of decking locations of merchantable timber, clarifies the final location of the chipped slash, clarifies subgrade tolerances, clarifies the sign installation, clarifies the utilities, clarifies traffic control restrictions during paving operations, and adds a secondary waste disposal area on the south end of the project.
Matthew A. Morris, Contracting Officer, Phone 2083734166, Email mamorris@fs.fed.us