The RFP Database
New business relationships start here

NEW DOCK SYSTEM INSTALLATION


Vermont, United States
Government : Municipal
RFP
Go to the link
This document has expired, therefore the above link may no longer work.

The project will include construction and complete installation of one 30 foot long dock approach ramp with end floats and a reinforced aluminum diamond plate approach ramp, two adjustable wheel kits, hand railing, edge curbing, dock cleats, and one 20 foot long floating dock section two adjustable wheel kits, hand railing, end railing, edge curbing, and dock cleats to be placed along the south ramp. As an add-alternate to the project, a second dock system with two 16 foot sections, with a reinforced aluminum diamond plate approach ramp, two adjustable wheel kits, hand railing, end railing, edge curbing, and dock cleats will be manufactured, delivered and placed along the northeasterly ramp inside the existing stone breakwater. This project may include other incidental work necessary to complete the project. The contractor may provide alternative dock systems that conform to the overall dock system area, and meet like performance specifications, as described in the specifications.

    1. Home
    2. Articles
    3. Login or Register

    4. Search

    5. Add/Announce your RFP