Time is of the essence, the Work includes; coordinating delivery, handling, installing twenty (20) each District supplied 24 X 24 square prestressed concrete fender piles, chocks, wales, blocks, and associated mounting hardware; and other ancillary items of work as shown on the drawings, as specified in the specifications, and required for a fully operational fendering system. The project is located at Broadway Pier, San Diego California.